It was 1986 when the last Fire Tiger appeared on the Chinese calendar. That was also the year when a delegation of former Finnish colleagues joined Chinese leaders to establish local offices in Beijing and Shanghai. The foundation for expanding modern wire & cable production within China was set. Today we celebrate 40 years since the launch while recognizing the powerful symbol of the tiger – much bravery, energy, passion, and charisma.
Yunjie Wu (Brown) has been with Maillefer since the start of the Chinese adventure and experienced first-hand the series of changes that have taken place over four decades. He summarizes them in the following six phases that hints of more to come.
This phase got started thanks to earlier contacts and exchange of expertise from four years before. It was May 1974 when a large Finnish delegation composed of business leaders and technology experts had been invited into China for week-long talks with industry leaders. Specialists spoke of wire & cable extrusion, including high-voltage plastic insulated cables. The demand for production capacity to come from Europe took shape.
Our extrusion equipment got introduced to Chinese-owned companies as early as 1978. Deliveries went to communication and power cable manufacturers within the region, exemplified by the Chengdu Cable Factory, who imported a total of eight of our telecom lines over the period. Ultimately, it was the opening of the Beijing location that really pushed business development forward.
In 1986, then Chinese and Finnish Prime Ministers led the opening ceremony of the Beijing Representative Office. At the same time, the company’s Service Center was opened at the Shanghai Cable Research Institute (SECRI) in the notable presence of SECRI’s Leader and China’s Machinery Industry Minister.
It was 1988. A then newly merged entity named Nokia-Maillefer SA opened its representative office doors in Hong Kong. Six years later, the Shanghai representative office was established. Members from SECRI and the company’s Chinese locations gathered in Shanghai to celebrate. Mr. Wu (Brown), member of the founding team, was there. The move expanded sales and service staff. It further strengthened partnerships amongst Chinese cable customers.
Then in 1995, a joint venture named SNOMAC was established in Shanghai. It introduced an era of providing locally manufactured small-diameter insulated wire, optical cable, communication cable sheathing equipment, and blown film equipment to China.
During this period, Maillefer's communication cable equipment and power cable equipment businesses developed rapidly, with communication cables accounting for over one-third of insulation production lines introduced in China during the same period, and nearly 90% of the market share of imported dry cross-linked production line equipment.
There were many firsts happening at the same time. There was the first vertical tower (Zhengzhou Cable), the first optical cable production line, the first large-foam RF cable production line (Shanghai No. 23 Institute), the first railway digital signal cable production line (Jiaozuo Railway), and more.
The end of the 20th century had been remarkable by a series of acquisitions, reorganizations, and rebranding. It was the beginning of a new century, with the year 2000 signaling a 100th anniversary and changes to come. It was 2001. The company reaffirmed itself under the Maillefer name and welcomed the promise of more business opportunity in China.
Maillefer weathered events which effected activities over the next decade, notably the 2002 dot-com bust and the 2008 crisis. Business continued to develop in China. By 2010, both communication cable equipment and medium- and high-voltage power cable equipment had surpassed the 100-point bottleneck. More new extrusion systems were being installed by Chinese customers to produce ever complex constructions, such as high-temperature fluoroplastic foaming extrusion wires destined for smart phones, aerospace cables, and multi-layer railway signal cables.
At the end of 2010, the Shanghai unit was restructured into a wholly-owned Maillefer subsidiary, forming a trading company. Maillefer introduced a fresh new logo in 2013 together with a priority placed on its R&D cabilities in Switzerland and Finland. The aim was to best drive extrusion line development to respond wind and solar power requirements.
At the end of 2017, Maillefer joined the Davis-Standard Corporation and affirmed its flagship position. Today, Maillefer counts nearly 600 of its production lines sold within China, along with many standalone machines such as extruders. Over 95% of this capacity is still in operation.
Mr. Wu (Brown) and the entire Shanghai team can be proud of their ongoing role in China's cable and precision pipe-making industries. So, the story goes on.
Fixed to a 60-year cycle, the Fire Tiger appears once again in 2046. Maillefer continues to serve its Chinese customers and to nurture the long-time partnerships. As we celebrate these past forty years together, we much look forward to the return of powerful totem with just as much energy, passion, and charisma as on that founding day, back in 1986.