Nov 11, 2024 5:03:06 AM
Belden's relationship with Maillefer is decades old, much like their first EKP dual take-ups that are still in service. Belden- Duna gives answers about modernizing their take-ups.
Aug 22, 2024 5:06:51 AM
For decades, Maillefer’s EKP take-ups have become synonym of reliability and high quality. Even though the EKP is robust, there is a high probability of a control system failure.
Aug 15, 2024 10:37:25 AM
The pay-off/take-up family now includes a 120-ton heavyweight. The new FPO/ FTU 120 offers higher winding capacity for EHV power cable manufacturing lines.
Jul 17, 2024 4:03:26 AM
The KWS, KWI for profile, and TUT join the family of coilers / reelers / take-ups best suited for winding pipe, tube and profile. They offer the right fit for the right job.